Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM) Project
Nuclear Waste Services has awarded a contract for the Southern Trench Cap Interim Membrane (STIM) Replacement project, which forms part of the Repository Development portfolio of work at the LLW Repository facility near Drigg Village in Cumbria, England.<br/><br/>The scope consists of civil engineering works associated with installing an engineered interim trench cap over the Southern Trenches.<br/><br/>The scope is to provide labour, equipment, materials, project management and supervision to complete the work. Wo...
Buyer
Nuclear Waste Services Limited
Value
£53,000,000
Published
6 Aug 2024
Closes
23 Oct 2023
Procurement details
Source
Find a Tender
Region
West Cumbria
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
45200000
Works for complete or part construction and civil engineering work
44900000
Stone for construction, limestone, gypsum and slate
45222000
Construction work for engineering works except bridges, tunnels, shafts and subways
45112360
Land rehabilitation work
45112310
Infill work
71000000
Architectural, construction, engineering and inspection services
45112000
Excavating and earthmoving work
Lots
Lot 1 Repository Development (RD) Southern Trench Cap Interim Membrane Replacement (STIM) Project
£53,000,000
NWS procured a Southern Trench Cap Interim Membrane Replacement Contract via the Restricted Procedure. <br/><br/>The contract value is up to £67m and is inclusive of associated risks & contingency.
Delivery: West Cumbria, Cumbria
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.