Supply of One New Towage Boat (Design and Build)
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas.
Buyer
ORKNEY ISLANDS COUNCIL
Value
£6,990,000
Published
28 Sept 2022
Closes
28 Sept 2022
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
34513200
Tug boats
34521000
Specialised boats
34520000
Boats
Lots
Lot 1 Supply of One New Tug Boat (Design and Build) - Currently Under Construction
£6,990,000
The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel i...
Delivery: Orkney Islands
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.