Cell Cycling Equipment for UKBIC Flexible Industrialisation Line (FIL)
UKBIC has a requirement to purchase a range of equipment for manufacturing conformance testing of battery cells to establish a Flexible Industrialisation Line (FIL) at the UK Battery Industrialisation Centre. The UK Battery Industrialisation Centre (UKBIC) is part of the UK Government’s Faraday Battery Challenge. UKBIC is a national battery manufacturing development facility helping to scale-up battery manufacturing and facilitate upskilling in the battery sector. We are a publicly funded, open access facility, fun...
Buyer
UK Battery Industrialisation Centre
Value
Not provided
Published
22 Sept 2022
Closes
22 Sept 2022
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Not provided
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
42000000
Industrial machinery
31000000
Electrical machinery, apparatus, equipment and consumables; lighting
38970000
Research, testing and scientific technical simulator
38900000
Miscellaneous evaluation or testing instruments
44211100
Modular and portable buildings
Lots
Lot 1 Cell Cycling Equipment
Value not provided
Lot 1 – Cell cycling equipment Cell cycling equipment with an operating voltage range of -5V to +5V (or similar) is required. It is envisaged that a quantity of 96 to 192 test channels of 15A per channel capability will be required, along with 16 to 96 channels of 100A per channel capability. The provision of cabling and test fixtures for connecting the cycl...
Delivery: West Midlands
Lot 2 Temperature Chambers
Value not provided
Lot 2 – Temperature chambers Temperature chambers are required to house all of the cells and test fixtures (see Lot 1) for long term cycle life testing. The temperature range of the chambers should be -20ºC to +80ºC and the chambers should be rated to EUCAR 5 or 6 (to be confirmed).
Delivery: West Midlands
Lot 3 Modular Building
Value not provided
Lot 3 – Modular building A containerised solution or modular building to house the equipment in Lots 1 and 2 and providing controlled environments for an operator control room, an equipment room and the main testing area is required. This building will be located outside and appropriate fire, safety and security management systems should be incorporated.
Delivery: West Midlands
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.