Cranbrook-Monkerton District Heating Interconnector - Pipeline Design/Construction and/or Operation and Maintenance
Construction and fit-out of a Heat Transfer Station (circa 23MW capacity) on an EfW site comprising District Heating pumps, construction of a 7.5 km heat transmission main and supply and installation of 2 no heat transfer interfaces in East Devon. The project is to connect the existing and yet to be developed parts of the Cranbrook/Skypark and Monkerton heat networks to a low carbon heat source at Hill Barton Business Park. When completed the project will provide low carbon heat to some 12,000 homes from an Energy...
Buyer
East Devon District Council
Value
£30,000,000
Published
24 Apr 2023
Closes
5 May 2023
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
44161000
Pipelines
44161100
Gas pipelines
Lots
Lot 1 Lot 1: Design and Build/Construction Package
£25,000,000
- Construction and fit-out of a Heat Transfer Station (circa 23MW capacity) on an EfW site comprising District Heating pumps - Construction of a 7.5 km heat transmission main (maximum diameter 350 mm) - Installation will involve a mixture of rural roads, farmland and public highway - Tunnelling (currently proposed method is pipe jacking) required under dual...
Delivery: Devon CC, Devon
Lot 2 Lot 2: Operation and Maintenance
£5,000,000
- Operation, maintenance and inspections of the constructed pipeline - Operation, maintenance and inspections of heat transfer station - Contractors will be responsible for service, maintenance, repair, replacement and inspection of all plant and equipment included in this package This contract will be offered as an initial 5 year contract, with 2 extensions...
Delivery: Devon CC, Devon
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.