Technology Development Centre
ORE Catapult is extending its operations at its Blyth site to create a Technology Development Centre (“TDC”) by refurbishing a storage shed, currently known as Shed D. The aspiration for the refurbished building and the new office space is for it to both reflect and inspire the innovative and renewable energy creative nature of the business. ORE Catapult require the fabric of the building to be refurbished and to create a two (2) storey office space within the building.
Buyer
OFFSHORE RENEWABLE ENERGY CATAPULT
Value
£4,000,000
Published
12 Feb 2024
Closes
9 Dec 2022
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45262690
Refurbishment of run-down buildings
45453100
Refurbishment work
31170000
Transformers
45310000
Electrical installation work
45223000
Structures construction work
45262400
Structural steel erection work
45262410
Structural steel erection work for buildings
45262420
Structural steel erection work for structures
Lots
Lot 1 Technology Development Centre
£2,600,000
ORE Catapult is extending its operations at its Blyth site to create a Technology Development Centre (“TDC”) by refurbishing a storage shed, currently known as Shed D. The aspiration for the refurbished building and the new office space is for it to both reflect and inspire the innovative and renewable energy creative nature of the business. ORE Catapult req...
Delivery: Northumberland
Lot 2 Technology Development Centre
£700,000
1. Supply and install a ring main switch within the BT2 11kV switch room 2. Supply and installation of underground cabling 3. Construction of an external transformer compound 4. Construct a HV switch room within the building to accommodate all of the electrical switch gear 5. Supply and install within the above compound 2 (two) 1MVA 11kV to 415V transformers...
Delivery: Northumberland
Lot 3 Technology Development Centre
£350,000
ORE Catapult has a requirement to construct permanent weather proofing to a 6MW bearing test rig at its site in Blyth, Northumberland, which would require a footprint of approximately 8m by 8m to a height in the region of 10m; . Design and installation of a weather proofing solution to protect the central ‘hub’ region of the test rig to replace the short-ter...
Delivery: Northumberland