Civil Engineering Framework (Scotland)
Scottish Procurement acting through Scottish Ministers have worked with industry on the development of a national framework for civil engineering for Scotland. This will be a multi-lot, multi-supplier framework for a 4 year period whereby civil engineering contracts (work orders) with a value greater than 5,000,000 GBP up to 100,000,000 GBP(excluding VAT) can be individually called-off as required by the Scottish public sector. The framework will be divided into 3 lots, based on value & whether the works are catego...
Buyer
Scottish Government
Value
£600,000,000
Published
17 Jun 2022
Closes
1 Aug 2022
Procurement details
Source
Find a Tender
Region
UKM82
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
Lots
Lot 1 General Civil Engineering Works greater than 5M GBP and up to 25M GBP
Value not provided
Lot 1 will cover all general civil engineering works at national (Scotland) level for individual contracts(Work Orders) with a value greater than 5,000,000 GBP up to 25,000,000 GBP. Economic Operators must have design capability as work packages may be called-off on a design and build basis. We intend to appoint a maximum of SIX suppliers to Lot 1.
Delivery: Scotland
Lot 2 Structural Civil Engineering Works greater than 5M GBP up to 25M GBP
Value not provided
Lot 2 will cover all structural civil engineering works at national (Scotland) level for individual contracts (Work Orders) with a value greater than 5,000,000 GBP up to 25,000,000 GBP. Economic Operators must have design capability as work packages may be called-off on a design and build basis. We intend to appoint a maximum of SIX suppliers to Lot 2.
Delivery: Scotland
Lot 3 All Civil Engineering Works greater than 25M GBP up to 100M GBP
Value not provided
Lot 3 will cover all civil and structural engineering works at national (Scotland) level for individual contracts (Work Orders) with a value greater than 25,000,000 GBP up to 100,000,000 GBP. Suppliers must have design capability as the work packages may be called-off on a design and build basis. It is intended that a maximum of FOUR suppliers will be appoin...
Delivery: Scotland
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.