Supply of One New Towage Boat (Design and Build)
Orkney Islands Council, as Statutory Harbour Authority (the “Authority”) has a requirement for the supply of one design and build tug boat which meets the Council’s specification, which are required to provide a safe and reliable towage service in the Scapa Flow (including Flotta Oil Terminal) and Kirkwall harbour areas.
Buyer
ORKNEY ISLANDS COUNCIL
Value
£7,500,000
Published
2 Jun 2022
Closes
4 Jul 2022
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
34513200
Tug boats
34521000
Specialised boats
34520000
Boats
Lots
Lot 1 Supply of One New Tug Boat (Design and Build) - Currently Under Construction
£7,500,000
The Basic Specification is given as a guide as to the specific requirements of the Owner. 1.1. The principal dimensions of the vessel are expected to be approximately as follows:- Length overall : +/- 32 metres Breadth extreme : 12 to 14 metres Operating draft : MAXIMUM of 5.50 metres (navigational draft), when fully loaded with fuel and FW 1.2. The vessel i...
Delivery: Orkney Islands
Lot 2 Supply of One New Tug Boat (Design and Build)
£7,500,000
The provision (design and build) of one new-build tug boat to meet the Council’s specification as detailed in Lot 1, apart from the main engines which must be:- IMO Tier III Caterpillar 3516E or equivalent. This option (Lot 2) to include total cost of supply and fit out of associated after treatment equipment such as but not limited to Clean Emissions Module...
Delivery: Orkney Islands
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.