https://www.ssen-transmission.co.uk/
The tendered works include for the design, supply, installation, testing and commissioning of electricity transmission underground cable works as part of the Skye 132kV Reinforcement scheme. The works consist of 24km of new 132kV double circuit, two cable per phase (see figure 1 below). These works include: • Undergrounding of the section of the new 132kV double circuit from the East side of Loch Ainort for15km to the West side of Loch Sligachan. Including a single fibre optic cable. • Laying of haul roads and acce...
Buyer
Scottish Hydro Electricity Transmission PLC
Value
£245,000,000
Published
22 Jul 2024
Closes
25 Mar 2022
Procurement details
Source
Find a Tender
Region
United Kingdom
Procurement method
Selective
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45230000
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
65310000
Electricity distribution
31200000
Electricity distribution and control apparatus
31321300
High-voltage cable
45231400
Construction work for electricity power lines
45314310
Installation of cable laying
Lots
Lot 1 Skye 132kV Reinforcement
Value not provided
The tendered works include for the design, supply, installation, testing and commissioning of electricity transmission underground cable works as part of the Skye 132kV Reinforcement scheme. The works consist of 24km of new 132kV double circuit, two cable per phase (see figure 1 below). These works include: • Undergrounding of the section of the new 132kV do...
Delivery: United Kingdom
Lot 2 Skye 132kV Reinforcement
Value not provided
The area between Invergarry / Glen Moriston and Fort Augustus, approximate length is 9Km of underground cable works
Delivery: United Kingdom
Lot 3 Skye 132kV Reinforcement
Value not provided
Lot 1 and Lot 2 combined as a single contract
Delivery: United Kingdom
Lot 4 Skye 132kV Reinforcement
Value not provided
Overhead Line Works at Fort Augustus up to (NG 95890 05565) tower QB209 including foundation and tower
Delivery: United Kingdom
Lot 5 Skye 132kV Reinforcement
Value not provided
Overhead Line Works at (NG 95890 05565) tower QB209 to Edinbane.
Delivery: United Kingdom
Lot 6 Skye 132kV Reinforcement
Value not provided
Lot 4 and Lot 5 combined as a single contract
Delivery: United Kingdom
Documents
No document metadata is available for this public record.