In-Vessel Mirrors for the MAST-U EBW System
UKAEA is installing an Electron Bernstein Wave (EBW) system on MAST-U, which aims at injecting two dual-frequency (28GHz and 34.8GHz) microwave beams each of up to 900kW and pulse duration of 4.5s. There are eight 1 OFF in-vessel copper-coated graphite mirrors. The primary function of the in-vessel mirrors is to redirect the microwaves, produced by the gyrotron, and direct these into the plasma. The main microwave mirror face has a curved profile, providing focusing of the beam. The curved profile is defined using...
Buyer
United Kingdom Atomic Energy Authority (UKAEA)
Value
£1
Published
2 Feb 2022
Closes
2 Feb 2022
Procurement details
Source
Find a Tender
Region
Berkshire, Buckinghamshire and Oxfordshire
Procurement method
Not provided
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
38622000
Mirrors
14715000
Copper
14814000
Artificial graphite
71333000
Mechanical engineering services
Lots
Lot 1 In-Vessel Mirrors for the MAST-U EBW System
Value not provided
UKAEA is installing an Electron Bernstein Wave (EBW) system on MAST-U, which aims at injecting two dual-frequency (28GHz and 34.8GHz) microwave beams each of up to 900kW and pulse duration of 4.5s. There are eight 1 OFF in-vessel copper-coated graphite mirrors. The primary function of the in-vessel mirrors is to redirect the microwaves, produced by the gyrot...
Delivery: Oxfordshire
Documents
No document metadata is available for this public record.
Contains public sector information licensed under the Open Government Licence v3.0.