Open Tenderocds-h6vhtk-02eaf4

Dynamic Purchasing System for Building Safety and Security Systems - Additional Lots

Clarion Housing Group (CHG) are seeking to add two Lots to our existing Dynamic Purchasing System (DPS) for Building Safety and Security Systems. There are four Lots on the original DPS. The additional two Lots are for: Lot 5: Fire Stopping Lot 6: Fire Door Repair & Installation The estimated spend across these Lots is £2.5M pa or £25m over the period of the DPS. The initial DPS Lots spend were estimated at £18M over 10 years. As such the total estimated spend for the DPS for Building Safety and Security Systems is...

Buyer

CLARION HOUSING GROUP LIMITED

Value

£25,000,000

Published

14 Apr 2025

Closes

15 Nov 2021

Procurement details

Source

Find a Tender

Region

Camden and City of London

Procurement method

Selective

Category

Services

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

51110000

Installation services of electrical equipment

45343000

Fire-prevention installation works

44480000

Miscellaneous fire-protection equipment

44482000

Fire-protection devices

45343100

Fireproofing work

51700000

Installation services of fire protection equipment

75251110

Fire-prevention services

44221220

Fire doors

Lots

Lot 5 Fire Stopping

£12,500,000

This is an important part of the passive fire protection for a building and is the process of filling any perforations or voids in its existing compartmentation with fire rated materials in order to prevent fire, smoke and heat passing through building compartments. These compartments are designed to restrict both horizontal and vertical fire spread. Fire st...

Delivery: East Of England, London, East Midlands (England), West Midlands (England), South East (England), South West (England)

Lot 6 Fire Door Repair & Installation

£12,500,000

Contractors will be expected to provide certification and test evidence related to the doors they are proposing to install on Clarion projects. Primary tested door sets to be installed in the following circumstances:- •Flat entrance fire doors in blocks of flats, sheltered units. •Bedroom doors in supported units. •Communal fire doors (cross-corridor and ser...

Delivery: East Of England, London, East Midlands (England), West Midlands (England), South East (England), South West (England)

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.