Pipeline Noticeocds-h6vhtk-02c4b4

Shielding Design

The STEP design will include superconducting magnets within its center column which will be subjected to large high-energy neutron fluxes from the plasma. If unprotected, the neutron bombardment of the superconducting magnets results in an operating lifetime of only a few hours. To address this, an in-board neutron shield is needed to reduce the neutron flux reaching the superconducting magnets and prolong their operational lifetime to a viable level.

Buyer

United Kingdom Atomic Energy Authority (UKAEA)

Value

£500,000

Published

7 Jul 2021

Closes

7 Jul 2021

Procurement details

Source

Find a Tender

Region

Berkshire, Buckinghamshire and Oxfordshire

Procurement method

Not provided

Category

Services

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

71320000

Engineering design services

72244000

Prototyping services

73200000

Research and development consultancy services

Lots

Lot 1 Shielding Design

Value not provided

The STEP design will include superconducting magnets within its center column which will be subjected to large high-energy neutron fluxes from the plasma. If unprotected, the neutron bombardment of the superconducting magnets results in an operating lifetime of only a few hours. To address this, an in-board neutron shield is needed to reduce the neutron flux...

Delivery: Oxfordshire

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.