Awarded Contractocds-h6vhtk-029c9d

Design and build geothermal infrastructure for the UK Geoenergy Observatory at Cuningar Loop, Glasgow, UK

Short description: The British Geological Survey (BGS) and the Natural Environment Research Council (NERC) are constructing a mine water geothermal research facility on the Cuningar Loop in east Glasgow as part of the UK Geoenergy Observatories project (from now on referred to as the ‘Glasgow Observatory’). Both NERC and BGS form a part of the UK Research and Innovation (UKRI). The tender is for the procurement of a supplier to provide the design and build support to BGS (the Client) in delivery of the geothermal i...

Buyer

UKRI

Value

£310,000

Published

2 Jun 2021

Closes

21 Apr 2021

Procurement details

Source

Find a Tender

Region

Swindon

Procurement method

Open

Category

Works

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

45000000

Construction work

45210000

Building construction work

71541000

Construction project management services

71500000

Construction-related services

45100000

Site preparation work

45120000

Test drilling and boring work

45200000

Works for complete or part construction and civil engineering work

45220000

Engineering works and construction works

Lots

Lot 1 Design and build geothermal infrastructure for the UK Geoenergy Observatory at Cuningar Loop, Glasgow, UK

£310,000

The supplier will develop the ‘Detailed Design Specification’ through collaboration with the Client, to deliver an engineering design for the bespoke research infrastructure that meets the science requirements within the specified budget. Assuming the design is accepted, the supplier will build the design such that the facility is ‘research-ready’. The geoth...

Delivery: UKM82

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.