Awarded Contractocds-h6vhtk-029a81

Rolling Stock Class 777 Moves

Due to a capacity issue on the Merseyrail Electric Network there will be a requirement to move a number of the class 777 units to locations outside of the network. The class 777 units are Electric Multiple units at a length of 65m and consist of 4 cars operated by means of a 750dc 3rd rail. The units will have to be hauled over non-3rd rail electrified lines. The number of moves required is unknown at present, but it is expected movement from the network will need to commence during the first week in June. The regu...

Buyer

Merseytravel

Value

£800,000

Published

9 Dec 2021

Closes

12 Apr 2021

Procurement details

Source

Find a Tender

Region

Liverpool

Procurement method

Open

Category

Services

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

50000000

Repair and maintenance services

34000000

Transport equipment and auxiliary products to transportation

Lots

Lot 1 Rolling Stock Class 777 Moves

£800,000

Due to a capacity issue on the Merseyrail Electric Network there will be a requirement to move a number of the class 777 units to locations outside of the network. The class 777 units are Electric Multiple units at a length of 65m and consist of 4 cars operated by means of a 750dc 3rd rail. The units will have to be hauled over non-3rd rail electrified lines...

Delivery: North West (England)

Documents

No document metadata is available for this public record.

Contains public sector information licensed under the Open Government Licence v3.0.