Longrock Coastal Protection Penzance Stage 2 Hire of Specialist Operated Plant
For the hire of a 35T excavator (operated) with Rock Grab and the hire of a 25T excavator (operated) with Rock Grab for an approx. duration of 20no. weeks - hire commencement/delivery date 22/03/19. The operated excavators shall be utilised at various stages of Rock Armour Works on the Marazion coastline in Longrock, Penzance Cornwall. The operated excavators shall be required to take delivery, sort, stockpile, load and most importantly place approx. 12,700 tonnes of armour stone over a period of approx. 20no. week...
Buyer
Cornwall Council
Value
£80,000
Published
6 Mar 2019
Closes
15 Mar 2019
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45500000
Hire of construction and civil engineering machinery and equipment with operator
Lots
Lot default Longrock Coastal Protection Penzance Stage 2 Hire of Specialist Operated Plant
£80,000
For the hire of a 35T excavator (operated) with Rock Grab and the hire of a 25T excavator (operated) with Rock Grab for an approx. duration of 20no. weeks - hire commencement/delivery date 22/03/19. The operated excavators shall be utilised at various stages of Rock Armour Works on the Marazion coastline in Longrock, Penzance Cornwall. The operated excavator...
Delivery: South West · United Kingdom, South West, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
6 Mar 2019
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.