Platinum Plott
1. To install medium duty footway along the line of the provided plan including: a. Ease gradients along the path line b. Dig out topsoil to minimum 200mm and form gently sweeping path minimum 1200mm wide (approx. 250m long) Store onsite for re-use. c. Form circle path designs as per plan and on-site discussions d. Lay weed control fabric along path base e. Supply, lay and compact suitable hard filling for path [non-recycled Type 1 stone or similar] to form the path base to within 50mm of finished surface. f. Suppl...
Buyer
Stretton on Dunsmore Parish Council
Value
£35,000
Published
19 Apr 2024
Closes
6 May 2024
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Limited
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45112500
Earthmoving work
Lots
Lot default Platinum Plott
£35,000
1. To install medium duty footway along the line of the provided plan including: a. Ease gradients along the path line b. Dig out topsoil to minimum 200mm and form gently sweeping path minimum 1200mm wide (approx. 250m long) Store onsite for re-use. c. Form circle path designs as per plan and on-site discussions d. Lay weed control fabric along path base e....
Documents
Unlock document linkOpportunity notice on Contracts Finder
19 Apr 2024
Opportunity notice on Contracts Finder
Tender notice · Web page
Scope of Work
Not provided
Scope of Work
Technical specifications · PDF
Drawing 1
Not provided
Drawing 1
Illustration · PDF
Drawing of proposed pathways
Not provided
Drawing of proposed pathways
Illustration · PDF
Contains public sector information licensed under the Open Government Licence v3.0.