Replacement Water Chiller at Buckland Hospital Dover
The existing Blue Box chiller has failed and a Tetris 32.4 chiller has temporarily been hired to provide chilled water to the roof mounted Ahu's and controlled via the sites own pumps and BMS system. The hired chiller has a nominal capacity of 300kw. The failed chiller has been temporarily located externally in the loading bay area and was a Tetris 38.4 STIPLN with a nominal 350 / 360kw. It is roof mounted and sited upon big foot support systems.
Buyer
East Kent Hospitals University
Value
Not provided
Published
24 Aug 2018
Closes
14 Sept 2018
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
42000000
Industrial machinery
Lots
Lot default Replacement Water Chiller at Buckland Hospital Dover
Value not provided
The existing Blue Box chiller has failed and a Tetris 32.4 chiller has temporarily been hired to provide chilled water to the roof mounted Ahu's and controlled via the sites own pumps and BMS system. The hired chiller has a nominal capacity of 300kw. The failed chiller has been temporarily located externally in the loading bay area and was a Tetris 38.4 STIP...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
24 Aug 2018
Opportunity notice on Contracts Finder
Tender notice · Web page
Link to eSourcing Portal
Not provided
Link to eSourcing Portal
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.