PHE - Corporate - Chilton Boiler System Replacement
Removal of the existing heating boilers, flues, insulation, control and isolation valves, and redundant pipework. As well, as the provision and installation of new heating boilers, flues, circulation pumps, pipework, dirt/air header, distribution pipework, gas, insulation, control and isolating valves, modified control panel and associated equipment to be installed in the boiler-room at Public Health England, Chilton. Address: Public Health England, Harwell Campus, Didcot, Oxford, OX11 0RQ.
Buyer
Public Health England
Value
£180,000
Published
29 May 2019
Closes
3 May 2019
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Other Sub OJEU
Category
Works
Contract starts
31 May 2019
Contract ends
23 Aug 2019
CPV classifications
42160000
Boiler installations
Lots
Lot default PHE - Corporate - Chilton Boiler System Replacement
£180,000
Removal of the existing heating boilers, flues, insulation, control and isolation valves, and redundant pipework. As well, as the provision and installation of new heating boilers, flues, circulation pumps, pipework, dirt/air header, distribution pipework, gas, insulation, control and isolating valves, modified control panel and associated equipment to be in...
Delivery: London · United Kingdom, London, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
29 May 2019
Awarded contract notice on Contracts Finder
Award notice · Web page
Link to eSourcing Portal
Not provided
Link to eSourcing Portal
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.