CVRT Final Drive Refurbishment Requirement
The Vehicle Support Team has a requirement to strip, inspect and refurbish circa 700 final drives on the Combat Vehicle Reconnaissance Tracked (CVRT) Mk 1. This requirement will involve inserting new planet carrier assemblies into all drives. Refurbishment of final drives are required to occur on a rolling basis to allow final drives to be cycled through the fleet. A minimum of 20 drives are to be refurbished each month. Refurbishment of final drives will require the Contractor to have the ability to inspect and re...
Buyer
Ministry of Defence, Land Equipment, Operational Support Vehicle Programme (OSVP)
Value
£10,000,000
Published
18 Jul 2018
Closes
9 Aug 2018
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
50116300
Repair and maintenance services of vehicle gearboxes
Lots
Lot default CVRT Final Drive Refurbishment Requirement
£10,000,000
The Vehicle Support Team has a requirement to strip, inspect and refurbish circa 700 final drives on the Combat Vehicle Reconnaissance Tracked (CVRT) Mk 1. This requirement will involve inserting new planet carrier assemblies into all drives. Refurbishment of final drives are required to occur on a rolling basis to allow final drives to be cycled through the...
Delivery: British Oversea Territories, Channel Islands, Europe, Isle of Man, Rest of the World, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
18 Jul 2018
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.