Awarded Contractocds-b5fd17-dadc2382-e5c5-4aa3-b37d-f1bd9fc264ac

Buckbarrow Bridge Replacement

The existing Buckbarrow Bridge is a two-span structure with the superstructure consisting of two equal spans of 8.75m. The bridge carried the U4064 County Road over Buckbarrow Beck (Non-main river). A load assessment of the bridge was carried out in May 2022, which identified significant failings in the original load assessment which was undertaken in 2000. Following this, an Interim Measures Feasibility report was produced which identified the need for a 3-tonne weight limit and a fortnightly inspection regime. Du...

Buyer

Cumberland Council

Value

£370,659

Published

21 Aug 2024

Closes

21 Jun 2024

Procurement details

Source

Contracts Finder

Region

East Cumbria

Procurement method

Other

Category

Works

Contract starts

22 Aug 2024

Contract ends

29 Jul 2025

CPV classifications

45000000

Construction work

Lots

Lot default Buckbarrow Bridge Replacement

£470,000

The existing Buckbarrow Bridge is a two-span structure with the superstructure consisting of two equal spans of 8.75m. The bridge carried the U4064 County Road over Buckbarrow Beck (Non-main river). A load assessment of the bridge was carried out in May 2022, which identified significant failings in the original load assessment which was undertaken in 2000....

Delivery: England · United Kingdom, England, United Kingdom

Awarded contract notice on Contracts Finder

21 Aug 2024

Awarded contract notice on Contracts Finder

Award notice · Web page

Contains public sector information licensed under the Open Government Licence v3.0.