Hybrid 2 63 Can Racks Project
In order to support the Nuclear Decommissioning Authority (NDA), Sellafield Ltd requires Hybrid 2 63 Can Racks ("Racks") to store spent fuel. Two contracts have been awarded for the manufacture, testing, inspection and delivery of Hybrid 2 63 Can Racks to Sellafield Ltd. The Hybrid 2 63 Can Racks are a high integrity, precision engineered, stainless steel, nuclear spent fuel containment system which need to be manufactured in accordance with the design specification set by Sellafield Ltd. The design specification f...
Buyer
CTM Portal for the NDA Shared Services Alliance
Value
£44,984,818
Published
11 Oct 2021
Closes
15 Apr 2021
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Goods
Contract starts
9 Sept 2021
Contract ends
31 Aug 2026
CPV classifications
09300000
Electricity, heating, solar and nuclear energy
Lots
Lot default Hybrid 2 63 Can Racks Project
£44,984,818
In order to support the Nuclear Decommissioning Authority (NDA), Sellafield Ltd requires Hybrid 2 63 Can Racks ("Racks") to store spent fuel. Two contracts have been awarded for the manufacture, testing, inspection and delivery of Hybrid 2 63 Can Racks to Sellafield Ltd. The Hybrid 2 63 Can Racks are a high integrity, precision engineered, stainless steel, n...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
11 Oct 2021
Awarded contract notice on Contracts Finder
Award notice · Web page