Mottram Road Retaining Wall (633N) Refurbishment and Associated Work Scheme 2017
Site 1 - Mottram Road Retaining Wall (633N) Mottram Road Retaining Wall (633N) is a 154m long masonry wall that acts as a boundary wall between the A57 Mottram Road and an adjacent vegetated embankment on the bank of Godley Brook. The land behind the wall is owned by Tameside MBC. The work is to ideally be undertaken before March 2017 to avoid the bird nesting season from November to March inclusive. Site 2 - Walkerfold Culvert (015) Walkerfold Culvert carries Werneth Brook from south to north beneath Mottram road...
Buyer
Tameside Metropolitan Borough Council
Value
£220,000
Published
12 Jan 2017
Closes
17 Feb 2017
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
44000000
Construction structures and materials; auxiliary products to construction (except electric apparatus)
Lots
Lot default Mottram Road Retaining Wall (633N) Refurbishment and Associated Work Scheme 2017
£220,000
Site 1 - Mottram Road Retaining Wall (633N) Mottram Road Retaining Wall (633N) is a 154m long masonry wall that acts as a boundary wall between the A57 Mottram Road and an adjacent vegetated embankment on the bank of Godley Brook. The land behind the wall is owned by Tameside MBC. The work is to ideally be undertaken before March 2017 to avoid the bird nesti...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
12 Jan 2017
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.