Kelsey Park Bridges Replacement
The footbridge is an all-timber deck 17.7m long with a clear width of 1.77 meters between parapets. The footbridge has a humpback design, with a headroom clearance of 1.44 meters at the midspan and 0.45 m on the eastern side and 0.55 m on the western side over the canal river. The existing structure was in poor condition and is to be replaced with a wider footbridge to accommodate pedestrians, cyclists, and disabled commuters. The widened footbridge will require wider abutments and footpath approaches on both side...
Buyer
London Borough of Bromley
Value
£422,000
Published
15 Dec 2023
Closes
24 Jan 2024
Procurement details
Source
Contracts Finder
Region
Bromley
Procurement method
Other
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45000000
Construction work
Lots
Lot default Kelsey Park Bridges Replacement
£422,000
The footbridge is an all-timber deck 17.7m long with a clear width of 1.77 meters between parapets. The footbridge has a humpback design, with a headroom clearance of 1.44 meters at the midspan and 0.45 m on the eastern side and 0.55 m on the western side over the canal river. The existing structure was in poor condition and is to be replaced with a wider fo...
Delivery: England · United Kingdom, England, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
13 Dec 2023
Opportunity notice on Contracts Finder
Tender notice · Web page
Opportunity notice on Contracts Finder
13 Dec 2023
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.