718 - Tube Furnace
The Centre for Process Innovation Ltd (CPI) requires the following; CPI requires an "off the shelf" (i.e. non-bespoke) split tube furnace capable of a maximum temperature of 1,200°C and an operating temperature up to 1,100°C. The furnace should be equipped with replaceable quartz tubes and capable of operating under air, inert or vacuum atmospheres. A series of relevant accessories are required including radiation shields (atmospheric and inert), insulation, extended work tubes, gas - tube fittings, vacuum tube f...
Buyer
NE1 PROCUREMENT SERVICES LIMITED
Value
£50,000
Published
22 Aug 2018
Closes
20 Jul 2018
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
19 Aug 2018
Contract ends
16 Aug 2020
CPV classifications
42300000
Industrial or laboratory furnaces, incinerators and ovens
Lots
Lot default 718 - Tube Furnace
£50,000
The Centre for Process Innovation Ltd (CPI) requires the following; CPI requires an "off the shelf" (i.e. non-bespoke) split tube furnace capable of a maximum temperature of 1,200°C and an operating temperature up to 1,100°C. The furnace should be equipped with replaceable quartz tubes and capable of operating under air, inert or vacuum atmospheres. A seri...
Delivery: North East · United Kingdom, North East, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
5 Jul 2018
Opportunity notice on Contracts Finder
Tender notice · Web page
Awarded contract notice on Contracts Finder
22 Aug 2018
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.