Open Tenderocds-b5fd17-bf85c902-7d5d-42f9-923c-d41f87800652

Supply of Temperature Control System

CPI requires a replacement chiller unit on the upper plant deck of The Neville Hamlin Building. The current Chilled water system has a Chilled water tank containing 30% Propyl alcohol and is circulated around the sites plant for cooling capacity. Cooling fluid temperature is set to 7 °C on supply to the plant. CPI have a requirement for the existing two chillers to be repaired, restoring capacity to OEM specification. Additional information: For more information please see the tender documentation, that is free to...

Buyer

CENTRE FOR PROCESS INNOVATION LIMITED

Value

Not provided

Published

23 Feb 2024

Closes

5 Mar 2024

Procurement details

Source

Contracts Finder

Region

South Teesside

Procurement method

Open

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

38800000

Industrial process control equipment and remote-control equipment

Lots

Lot default Supply of Temperature Control System

Value not provided

CPI requires a replacement chiller unit on the upper plant deck of The Neville Hamlin Building. The current Chilled water system has a Chilled water tank containing 30% Propyl alcohol and is circulated around the sites plant for cooling capacity. Cooling fluid temperature is set to 7 °C on supply to the plant. CPI have a requirement for the existing two chi...

Delivery: British Oversea Territories, Channel Islands, Europe, Isle of Man, Rest of the World, United Kingdom

Opportunity notice on Contracts Finder

23 Feb 2024

Opportunity notice on Contracts Finder

Tender notice · Web page

Additional information on how to apply for this contract

Not provided

Additional information on how to apply for this contract

Document

Contains public sector information licensed under the Open Government Licence v3.0.