Lynemouth - Design, Manufacture and Installation of Lagoon Baffles
The Employer requires a pair of bespoke baffles to be designed, manufactured and installed in a lagoon located at Lynemouth Mine Water Treatment Scheme. The Lynemouth Phase I mine water treatment scheme (MWTS) is located on the Northumberland coast on the site of the former Ellington Colliery. Coal mine water is abstracted at a rate of circa. 115 L/s from an abandoned mine shaft, treated through two lagoons configured in series before being discharged into the sea. The lagoons are constructed in colliery spoil and...
Buyer
MINING REMEDIATION AUTHORITY
Value
£47,277
Published
27 Dec 2019
Closes
20 Sept 2019
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Services
Contract starts
2 Dec 2019
Contract ends
31 Mar 2020
CPV classifications
43328000
Hydraulic installations
Lots
Lot default Lynemouth - Design, Manufacture and Installation of Lagoon Baffles
£47,277
The Employer requires a pair of bespoke baffles to be designed, manufactured and installed in a lagoon located at Lynemouth Mine Water Treatment Scheme. The Lynemouth Phase I mine water treatment scheme (MWTS) is located on the Northumberland coast on the site of the former Ellington Colliery. Coal mine water is abstracted at a rate of circa. 115 L/s from an...
Delivery: North East · United Kingdom, North East, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
6 Sept 2019
Opportunity notice on Contracts Finder
Tender notice · Web page
How to access the tender documents
Not provided
How to access the tender documents
Tender notice · PDF
Scope and Procurement Guidance
Not provided
Scope and Procurement Guidance
Tender notice · PDF
Awarded contract notice on Contracts Finder
27 Dec 2019
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.