HS2 C1 - North and South Porous Portal
The current package of work involves the construction of the 4nr Chiltern Tunnels' porous portals. One porous portal is made up of 2nr 500m stamped concrete wall from 4.5 to 7.4m high and 1nr 500mm thick curved concrete roof (inner diameter of 4.55m). There is one 240m and one 160m long portal at each end of tunnel (16km apart). Specific formworks have to be designed and supplied, allowing portals realisation while TBMs are boring and supplied. The package includes also the North Portal base slab (thickness 2m x 57...
Buyer
ALIGN JV (Bouygues Travaux Publics, VolkerFitzpatrick and Sir Robert McAlpine)
Value
£20,000,000
Published
30 Apr 2021
Closes
7 May 2021
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Limited
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45221240
Construction work for tunnels
Lots
Lot default HS2 C1 - North and South Porous Portal
£20,000,000
The current package of work involves the construction of the 4nr Chiltern Tunnels' porous portals. One porous portal is made up of 2nr 500m stamped concrete wall from 4.5 to 7.4m high and 1nr 500mm thick curved concrete roof (inner diameter of 4.55m). There is one 240m and one 160m long portal at each end of tunnel (16km apart). Specific formworks have to be...
Delivery: Guernsey, Isle of Man, Jersey, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
30 Apr 2021
Opportunity notice on Contracts Finder
Tender notice · Web page
Please follow this link to view the notice.
Not provided
Please follow this link to view the notice.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.