London Bridge Tracks - Surveying and testing
The current London Bridge was designed by Mott, Hay and Anderson. The senior engineer was Alan Simpson, the superstructure was designed by a team led by Michael Leeming, and foundations by a team led by Keith Ponting. The bridge was constructed by contractors John Mowlem and Company from 1967 to 1972, and opened by Queen Elizabeth II on 17 March 1973. It comprises three spans of pre-stressed concrete box girders, at a total of 928 feet (283 m) long. On the upstream and downstream sides of the bridge a track has bee...
Buyer
City of London Corporation
Value
£140,000
Published
18 Nov 2016
Closes
18 Sept 2015
Procurement details
Source
Contracts Finder
Region
London
Procurement method
Not Applicable
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71000000
Architectural, construction, engineering and inspection services
Lots
Lot default London Bridge Tracks - Surveying and testing
£140,000
The current London Bridge was designed by Mott, Hay and Anderson. The senior engineer was Alan Simpson, the superstructure was designed by a team led by Michael Leeming, and foundations by a team led by Keith Ponting. The bridge was constructed by contractors John Mowlem and Company from 1967 to 1972, and opened by Queen Elizabeth II on 17 March 1973. It com...
Delivery: London · United Kingdom, London, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
24 Aug 2015
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.