Supply Chain Notice: WAT0155-02 - Berth 5B3 Upgrade - Detailed Design
This project involves developing the finalised Basis of Design into a full detailed design and construction ready package for the refurbishment of Berth 5B3 within Portsmouth Naval Base. The upgrade will provide enhanced operational capacity of the non-tidal basin at Portsmouth Naval Base. The design development progresses the scheme from RIBA Stage 2 to RIBA Stage 4, covering all civil and structural elements required for delivery. The scope includes strengthening and adapting the quay structures and access road t...
Buyer
Ministry of Defence
Value
£750,000
Published
26 Feb 2026
Closes
26 Feb 2026
Procurement details
Source
Contracts Finder
Region
South East
Procurement method
Not provided
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71530000
Construction consultancy services
Lots
Lot default Supply Chain Notice: WAT0155-02 - Berth 5B3 Upgrade - Detailed Design
£750,000
This project involves developing the finalised Basis of Design into a full detailed design and construction ready package for the refurbishment of Berth 5B3 within Portsmouth Naval Base. The upgrade will provide enhanced operational capacity of the non-tidal basin at Portsmouth Naval Base. The design development progresses the scheme from RIBA Stage 2 to RIB...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkFuture opportunity notice on Contracts Finder
26 Feb 2026
Future opportunity notice on Contracts Finder
Planned procurement notice · Web page
n/a
Not provided
n/a
n/a
Not provided
n/a
n/a
Not provided
n/a
n/a
Not provided
n/a
Word document
n/a
Not provided
n/a
n/a
Not provided
n/a
Word document
n/a
Not provided
n/a
Contains public sector information licensed under the Open Government Licence v3.0.