Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required to hold the relevant site security passes. The Contractor shall be expected to hold the following levels of insurance £10m Public Liability, £10m Product Liab...
Buyer
Ministry of Defence
Value
Not provided
Published
24 Jul 2023
Closes
24 Jul 2023
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Not provided
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45241300
Pier construction work
Lots
Lot default Supply Chain Notice: WAT-0044-02- Design and Install a Tug Berth Pontoon Replacement
Value not provided
The Tenderer should be aware that the works detailed in this package are constrained due to the nature of the location they are to be conducted in. Project location HM Naval Base Portsmouth The Contractor shall be expected to adhere by the HMNB site security requirements, all Contractors and Sub-Contractors shall be BPSS security vetted and will be required...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkEarly engagement notice on Contracts Finder
24 Jul 2023
Early engagement notice on Contracts Finder
Market engagement notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.