CSF Lot 2B - WP17BS5 Middleton Hall Bridge.
This work package is for the 2 Stage Design and Build Works to effect the permanent repair of Middleton Hall Bridge. Stage One - Design will be a NEC3 ECC Option C Target Cost Contract. Stage Two - Build will be an NEC3 ECC Option A Fixed Price Contract. Following the 2015 floods the bridge was closed due to collapse at the downstream portal, a temporary bridge with localised resurfacing had been installed to reopen the road to traffic. Owing to further deterioration through 2016 temporary stabilisation of the dama...
Buyer
CUMBRIA COUNTY COUNCIL
Value
£599,207
Published
2 Mar 2018
Closes
12 Jan 2018
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Other
Category
Works
Contract starts
1 Apr 2018
Contract ends
6 Dec 2018
CPV classifications
45000000
Construction work
Lots
Lot default CSF Lot 2B - WP17BS5 Middleton Hall Bridge.
£599,206
This work package is for the 2 Stage Design and Build Works to effect the permanent repair of Middleton Hall Bridge. Stage One - Design will be a NEC3 ECC Option C Target Cost Contract. Stage Two - Build will be an NEC3 ECC Option A Fixed Price Contract. Following the 2015 floods the bridge was closed due to collapse at the downstream portal, a temporary bri...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
2 Mar 2018
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.