Environment Agency: Cley Floodwall Access Improvements
Recycled Plastic for Access Boardwalk. The 1.2m wide Boardwalk will be approximately 215 metres long with a handrail (with FSC Approved Softwood rails) on one side mostly and our design estimates the following quantities of materials below will be required. We have included generous allowances for surplus materials in the estimates as ground conditions do vary. The design is based on using recycled lumber and low slip potential boards as it will be in an intertidal zone. The boardwalk level will be above the normal...
Buyer
D E F R A
Value
£30,000
Published
19 Dec 2019
Closes
14 Jan 2020
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
44110000
Construction materials
Lots
Lot default Environment Agency: Cley Floodwall Access Improvements
£30,000
Recycled Plastic for Access Boardwalk. The 1.2m wide Boardwalk will be approximately 215 metres long with a handrail (with FSC Approved Softwood rails) on one side mostly and our design estimates the following quantities of materials below will be required. We have included generous allowances for surplus materials in the estimates as ground conditions do va...
Delivery: East of England · United Kingdom, East of England, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
19 Dec 2019
Opportunity notice on Contracts Finder
Tender notice · Web page