Installation of a 498Kw or 996kW Pellet Fuelled Biomass Boiler at the Beecroft Gallery, Southend on Sea
Southend Borough Council requires a suitably qualified contractor to install either a 498Kw or 996Kw Biomass pellet boiler to serve the Beecroft Gallery and Central Museum via a mini district heating system which will be incorporated within this project. The works will include: 1. The supply and installation of a pellet fueled biomass boiler housed within two hi-cube steel containers. The lower container will house the boiler plant and the Pellet store will be stacked on top. 2. Two options will be priced: a. A 498...
Buyer
Southend-on-sea Borough Council
Value
£400,000
Published
18 Nov 2016
Closes
9 May 2016
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Not Applicable
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45331000
Heating, ventilation and air-conditioning installation work
Lots
Lot default Installation of a 498Kw or 996kW Pellet Fuelled Biomass Boiler at the Beecroft Gallery, Southend on Sea
£400,000
Southend Borough Council requires a suitably qualified contractor to install either a 498Kw or 996Kw Biomass pellet boiler to serve the Beecroft Gallery and Central Museum via a mini district heating system which will be incorporated within this project. The works will include: 1. The supply and installation of a pellet fueled biomass boiler housed within tw...
Delivery: East of England · United Kingdom, East of England, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
3 May 2016
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.