Smith Street Car Park - Repair Works to Retaining Wall
Following an award (via an exemption due to extreme urgency) for works to re-build a retaining wall that supports Smith Street Car park above the River Roch, issues with ground water were encountered once excavations reached the required depths which hadn't been identified during the previous ground investigations. These issues caused the ground at foundation depth to be weaker than required and resulted in the work on site being stopped whilst an alternative design was determined. The delays to the scheme and chan...
Buyer
Rochdale Metropolitan Borough Council
Value
£570,000
Published
2 Apr 2025
Closes
24 Jun 2024
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Other
Category
Works
Contract starts
25 Jun 2024
Contract ends
18 Oct 2024
CPV classifications
45000000
Construction work
Lots
Lot default Smith Street Car Park - Repair Works to Retaining Wall
£570,000
Following an award (via an exemption due to extreme urgency) for works to re-build a retaining wall that supports Smith Street Car park above the River Roch, issues with ground water were encountered once excavations reached the required depths which hadn't been identified during the previous ground investigations. These issues caused the ground at foundatio...
Delivery: England · United Kingdom, England, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
2 Apr 2025
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.