Substation 9 LV Panel & Generator Replacement and Evelina Standby Power
The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to be delivered to allow for the expansion for the 'Evelina PTC' and the additional power requirements and system resilience that this project demands. This paper...
Buyer
Guy's and St Thomas' NHS Foundation Trust
Value
£3,978,000
Published
3 Aug 2026
Closes
31 Oct 2025
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Services
Contract starts
1 Nov 2025
Contract ends
31 Aug 2026
CPV classifications
71323100
Electrical power systems design services
Lots
Substation 9 LV Panel & Generator Replacement and Evelina Standby Power
Lot default
£3,978,198
The Trust has a requirement for the replacement of Electrical Substation 9 and an upgrade to the Evelina standby power system. The objective of the project is to remove the obsolescence risk for the existing LV electrical switch panels, and interlinked stand-by generators to meet the requirements of the existing electrical services. This requirement needs to...
Delivery: London · United Kingdom, London, United Kingdom
Document metadata
Awarded contract notice on Contracts Finder
Awarded contract notice on Contracts Finder
awardNotice · text/html
3 Aug 2026
Unlock document link