Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme
The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in the central reserve. It is fixed at the west abutment and free at the east abutment. The structure was commissioned in 1996 and has a design capacity of HA + 4...
Buyer
National Highways
Value
£181,335
Published
24 Sept 2025
Closes
15 Apr 2025
Procurement details
Source
Contracts Finder
Region
Birmingham
Procurement method
Selective
Category
Works
Contract starts
12 Jun 2025
Contract ends
6 Feb 2026
CPV classifications
45233210
Surface work for highways
Lots
Lot default Task Order from PDF framework for (619572) M60 River Irk Waterproofing Scheme
£181,335
The M60 River Irk Bridge is a single-span, simply supported underbridge that carries the dual three-lane M60 Motorway and junction 19 slip roads over the River Irk and a riverside footpath. The deck consists of rolled steel beams, acting compositely with in-situ reinforced concrete slab. The deck is split into two halves, separated by a longitudinal joint in...
Delivery: North East · United Kingdom, North West · United Kingdom, North East, North West, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
24 Sept 2025
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.