Esholt Village Surface Water Flood Alleviation Scheme
The project aims to alleviate surface water flooding in the village of Esholt. The most recent flooding was in February 2020 and prior to that extensive flooding occurred in December 2015. The scheme will protect 19 properties located within the centre of the village as well as a single property on Church Lane. The works involve intercepting the existing watercourse through the village and diverting it down Chapel Lane in a new piped system, which will outfall direct to the river Aire, as shown in the scheme drawin...
Buyer
City of Bradford Metropolitan District Council
Value
£250,000
Published
23 Sept 2020
Closes
9 Sept 2020
Procurement details
Source
Contracts Finder
Region
Bradford
Procurement method
Open
Category
Works
Contract starts
30 Sept 2020
Contract ends
26 Feb 2021
CPV classifications
45246400
Flood-prevention works
Lots
Lot default Esholt Village Surface Water Flood Alleviation Scheme
£200,000
The project aims to alleviate surface water flooding in the village of Esholt. The most recent flooding was in February 2020 and prior to that extensive flooding occurred in December 2015. The scheme will protect 19 properties located within the centre of the village as well as a single property on Church Lane. The works involve intercepting the existing wat...
Delivery: Yorkshire and the Humber · United Kingdom, Yorkshire and the Humber, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
23 Sept 2020
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.