Forestry England - Whinlatter Hydroelectric Power Scheme
Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre a...
Buyer
Forestry Commission
Value
£225,000
Published
18 Apr 2020
Closes
14 Apr 2020
Procurement details
Source
Contracts Finder
Region
Scotland
Procurement method
Not provided
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
31000000
Electrical machinery, apparatus, equipment and consumables; lighting
Lots
Lot default Forestry England - Whinlatter Hydroelectric Power Scheme
£225,000
Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
18 Apr 2020
Opportunity notice on Contracts Finder
Tender notice · Web page
Please follow this link to view the notice.
Not provided
Please follow this link to view the notice.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.