Open Tenderocds-b5fd17-7973eb63-20c6-4eec-b5d1-b5d2bcde28f6

Forestry England - Whinlatter Hydroelectric Power Scheme

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted planning permission, consisting of an inlet structure, penstock, turbine house and outlet, with electrical connections into both the Whinlatter Visitor Centre a...

Buyer

Forestry Commission

Value

£225,000

Published

18 Apr 2020

Closes

14 Apr 2020

Procurement details

Source

Contracts Finder

Region

Scotland

Procurement method

Not provided

Category

Goods

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

31000000

Electrical machinery, apparatus, equipment and consumables; lighting

Lots

Lot default Forestry England - Whinlatter Hydroelectric Power Scheme

£225,000

Forestry England (FE) has developed a scheme for the installation of a small-scale, high head hydropower system, with the maximum possible generating capacity (expected to be circa 140kW) within Whinlatter Forest, Cumbria. The purpose of the scheme is to transfer the Whinlatter site into a carbon free, net energy producer. An outline scheme has been granted...

Delivery: North West · United Kingdom, North West, United Kingdom

Opportunity notice on Contracts Finder

18 Apr 2020

Opportunity notice on Contracts Finder

Tender notice · Web page

Please follow this link to view the notice.

Not provided

Please follow this link to view the notice.

Tender notice

Contains public sector information licensed under the Open Government Licence v3.0.