HAZOP study of an energy generating demonstration system (ERDF)
EBRI wants to perform a detailed and systematic safety risk assessment of this system through a HAZOP study, which requires the plant documentation to be reviewed and modified for that specific purpose. Specifically, the work consists of items 1 to 5: 1. Modifying the current piping and instrumentation diagrams (P&IDs) to include the trips and alarms as well as the load bank and a fan. 2. Improving the current cause and effect diagram to make sure it contains all the information necessary for the HAZOP study. 3. Pr...
Buyer
Aston University
Value
£15,000
Published
18 Nov 2016
Closes
2 Nov 2016
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Other
Category
Services
Contract starts
17 Nov 2016
Contract ends
27 Feb 2017
CPV classifications
71300000
Engineering services
Lots
Lot default HAZOP study of an energy generating demonstration system (ERDF)
£19,000
EBRI wants to perform a detailed and systematic safety risk assessment of this system through a HAZOP study, which requires the plant documentation to be reviewed and modified for that specific purpose. Specifically, the work consists of items 1 to 5: 1. Modifying the current piping and instrumentation diagrams (P&IDs) to include the trips and alarms as well...
Delivery: West Midlands · United Kingdom, West Midlands, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
14 Nov 2016
Awarded contract notice on Contracts Finder
Award notice · Web page
Advert
Not provided
Advert
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.