Stour Culvert (0182) Major Maintenance works 2020 (Re-waterproofing)
Stour Culvert is an insitu reinforced concrete box structure. The culvert carries Stour Road over the Ellenor Brook watercourse. There is a single carriageway over the bridge for one lane of traffic in each direction. The works will comprise of excavation of road surfacing and fill material, removal of existing paving slabs, removal of existing waterproofing system to expose the concrete deck, preparation of concrete deck and application of new waterproofing system. This will be followed by reinstatement works incl...
Buyer
Wigan Council
Value
£80,000
Published
6 Aug 2020
Closes
4 Sept 2020
Procurement details
Source
Contracts Finder
Region
Greater Manchester North West
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45200000
Works for complete or part construction and civil engineering work
Lots
Lot default Stour Culvert (0182) Major Maintenance works 2020 (Re-waterproofing)
£80,000
Stour Culvert is an insitu reinforced concrete box structure. The culvert carries Stour Road over the Ellenor Brook watercourse. There is a single carriageway over the bridge for one lane of traffic in each direction. The works will comprise of excavation of road surfacing and fill material, removal of existing paving slabs, removal of existing waterproofing...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
6 Aug 2020
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.