G4_1_HCC_â034â ââA27 Corridor Continuous Footways â
ââA call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020).â ââThe planned works will see the installation of 2 contrasting surface crossings across minor road junctions with the A27, designed to give pedestrians right of way and create a walking/cycling corridor along the A27 in Portchester. One of these crossings will be a raised table, and the other at carriageway level. As part of the works, there will be some carriage...
Buyer
HAMPSHIRE COUNTY COUNCIL
Value
£104,973
Published
25 Oct 2023
Closes
7 Jul 2023
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Works
Contract starts
20 Aug 2023
Contract ends
10 Nov 2023
CPV classifications
45230000
Construction work for pipelines, communication and power lines, for highways, roads, airfields and railways; flatwork
Lots
Lot default G4_1_HCC_â034â ââA27 Corridor Continuous Footways â
£104,973
ââA call-off from the Generation 4-ONE 2020 - 2024 Civil Engineering, Highways and Transportation Collaborative Framework (Awarded April 2020).â ââThe planned works will see the installation of 2 contrasting surface crossings across minor road junctions with the A27, designed to give pedestrians right of way and create a walking/cycling corridor al...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
25 Oct 2023
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.