Open Tenderocds-b5fd17-6bd3b6df-adc8-11e6-9901-0019b9f3037b

Automation consultancy service

At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared. The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel mode and if required the load matching control system opens an isolation valve to start fuelling the engine with gas from the gasifier. A flowmeter measures the...

Buyer

Aston University

Value

Not provided

Published

18 Nov 2016

Closes

29 May 2015

Procurement details

Source

Contracts Finder

Region

United Kingdom

Procurement method

Not provided

Category

Services

Contract starts

Not provided

Contract ends

Not provided

CPV classifications

71314000

Energy and related services

Lots

Lot default Automation consultancy service

Value not provided

At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared. The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel m...

Delivery: West Midlands · United Kingdom, West Midlands, United Kingdom

Opportunity notice on Contracts Finder

21 May 2015

Opportunity notice on Contracts Finder

Tender notice · Web page

Request for Quotation and Response Template

Not provided

Request for Quotation and Response Template

Application/vnd.openxmlformats officedocument.wordprocessingml.document · Word document

Contains public sector information licensed under the Open Government Licence v3.0.