Automation consultancy service
At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared. The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel mode and if required the load matching control system opens an isolation valve to start fuelling the engine with gas from the gasifier. A flowmeter measures the...
Buyer
Aston University
Value
Not provided
Published
18 Nov 2016
Closes
29 May 2015
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Not provided
Category
Services
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
71314000
Energy and related services
Lots
Lot default Automation consultancy service
Value not provided
At the EBRI plant, a fluidised bed gasifier (1 MW) is connected to a combined heat and power generator. The capacity of the engine is not enough as to take all the gas from the gasifier, so part of the gas has to be flared. The engine is a MAN marine diesel engine modified to work in dual mode (liquid and gaseous biofuels). The engine starts in liquid fuel m...
Delivery: West Midlands · United Kingdom, West Midlands, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
21 May 2015
Opportunity notice on Contracts Finder
Tender notice · Web page
Request for Quotation and Response Template
Not provided
Request for Quotation and Response Template
Application/vnd.openxmlformats officedocument.wordprocessingml.document · Word document
Contains public sector information licensed under the Open Government Licence v3.0.