The Battle of Britain Bunker: (Phase 2) Water Mitigation Works
Award Notice The Battle of Britain Bunker was constructed in 1938 as the underground operations room replacing a ground level facility. In 1940 it was the nerve centre for directing the fighter protection over London and the Southeast. The Bunker was built on two levels, and remains largely unchanged, it contains its original air filtration system provided by two independent plant rooms, mains and standby power supplies, together with telephone exchanges and offices. It was closed for operational use in 1958. The b...
Buyer
London Borough of Hillingdon
Value
£889,310
Published
22 Aug 2023
Closes
21 Nov 2022
Procurement details
Source
Contracts Finder
Region
Harrow and Hillingdon
Procurement method
Open
Category
Works
Contract starts
31 May 2023
Contract ends
28 Feb 2025
CPV classifications
45111240
Ground-drainage work
Lots
Lot default The Battle of Britain Bunker: (Phase 2) Water Mitigation Works
£900,000
Award Notice The Battle of Britain Bunker was constructed in 1938 as the underground operations room replacing a ground level facility. In 1940 it was the nerve centre for directing the fighter protection over London and the Southeast. The Bunker was built on two levels, and remains largely unchanged, it contains its original air filtration system provided b...
Delivery: London · United Kingdom, London, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
22 Aug 2023
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.