Awarded Contractocds-b5fd17-6abd503c-2e8d-46df-aa82-656183fd6aff

The Battle of Britain Bunker: (Phase 2) Water Mitigation Works

Award Notice The Battle of Britain Bunker was constructed in 1938 as the underground operations room replacing a ground level facility. In 1940 it was the nerve centre for directing the fighter protection over London and the Southeast. The Bunker was built on two levels, and remains largely unchanged, it contains its original air filtration system provided by two independent plant rooms, mains and standby power supplies, together with telephone exchanges and offices. It was closed for operational use in 1958. The b...

Buyer

London Borough of Hillingdon

Value

£889,310

Published

22 Aug 2023

Closes

21 Nov 2022

Procurement details

Source

Contracts Finder

Region

Harrow and Hillingdon

Procurement method

Open

Category

Works

Contract starts

31 May 2023

Contract ends

28 Feb 2025

CPV classifications

45111240

Ground-drainage work

Lots

Lot default The Battle of Britain Bunker: (Phase 2) Water Mitigation Works

£900,000

Award Notice The Battle of Britain Bunker was constructed in 1938 as the underground operations room replacing a ground level facility. In 1940 it was the nerve centre for directing the fighter protection over London and the Southeast. The Bunker was built on two levels, and remains largely unchanged, it contains its original air filtration system provided b...

Delivery: London · United Kingdom, London, United Kingdom

Awarded contract notice on Contracts Finder

22 Aug 2023

Awarded contract notice on Contracts Finder

Award notice · Web page

Contains public sector information licensed under the Open Government Licence v3.0.