A63 Brough Junction Improvements
The proposed scheme replaces the existing 4 way traffic signal at the junction of the Welton Road/Water Lane(A63 slip road link)/Welton Low Road with a 3 way signalised roundabout, with Welton Low Road becoming a priority junction. It includes pedestrian and cycle improvements largely to improve the route to South Hunsley School to and from Brough. The existing junction is elevated and the new roundabout is elevated on an embankment to match the existing levels. The existing junction creates congestion at peak hour...
Buyer
MERCELL UK LTD
Value
Not provided
Published
3 Feb 2023
Closes
28 Feb 2023
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
45200000
Works for complete or part construction and civil engineering work
Lots
Lot default A63 Brough Junction Improvements
Value not provided
The proposed scheme replaces the existing 4 way traffic signal at the junction of the Welton Road/Water Lane(A63 slip road link)/Welton Low Road with a 3 way signalised roundabout, with Welton Low Road becoming a priority junction. It includes pedestrian and cycle improvements largely to improve the route to South Hunsley School to and from Brough. The exist...
Delivery: Yorkshire and the Humber · United Kingdom, Yorkshire and the Humber, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
19 Dec 2022
Opportunity notice on Contracts Finder
Tender notice · Web page
Additional data
Not provided
Additional data
Document
User / Company
Not provided
User / Company
Document
Additional data
Not provided
Additional data
Document
Contains public sector information licensed under the Open Government Licence v3.0.