Woolley Lane Retaining Wall (No. 715) Strengthening Scheme 2016/17
Woolley Lane Retaining Wall (TMBC No. 715) is located on the north side of Woolley Lane A57 in Hollingworth, Tameside (Grid Reference SK [contact phone hidden]). The wall is aligned from east to west and supports Woolley Lane A57 carriageway as well as a pedestrian footway. The lower side of the wall is a combination of public green area and private residential land. The wall has a retained height that varies, with a maximum of 2.2m and a total length of approximately 63m.
Buyer
Tameside Metropolitan Borough Council
Value
£100,000
Published
18 Nov 2016
Closes
25 Nov 2016
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Works
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
44000000
Construction structures and materials; auxiliary products to construction (except electric apparatus)
Lots
Lot default Woolley Lane Retaining Wall (No. 715) Strengthening Scheme 2016/17
£100,000
Woolley Lane Retaining Wall (TMBC No. 715) is located on the north side of Woolley Lane A57 in Hollingworth, Tameside (Grid Reference SK [contact phone hidden]). The wall is aligned from east to west and supports Woolley Lane A57 carriageway as well as a pedestrian footway. The lower side of the wall is a combination of public green area and private resident...
Delivery: North West · United Kingdom, North West, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
21 Oct 2016
Opportunity notice on Contracts Finder
Tender notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.