The Supply and Installation of an Inter-Connected Dual Circulating Fluidised Bed Reactor
Optimisation of chemical and catalytic processes requires engineers, chemists and chemical engineers working together to forge an understanding of all facets of the processes, from the atomic precision of designing atomic active sites, to large-scale reactor design. Many catalytic procedures default to a fixed-bed reactor, due to the range of control over flow rates, temperatures and pressures offered. However, such systems are typically limited to performing a single step of the full process, and are prone to cata...
Buyer
UNIVERSITY OF SOUTHAMPTON
Value
£31,125
Published
23 Nov 2020
Closes
15 Nov 2019
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Open
Category
Goods
Contract starts
9 Dec 2019
Contract ends
8 Dec 2020
CPV classifications
38000000
Laboratory, optical and precision equipments (excl. glasses)
Lots
Lot default The Supply and Installation of an Inter-Connected Dual Circulating Fluidised Bed Reactor
£37,500
Optimisation of chemical and catalytic processes requires engineers, chemists and chemical engineers working together to forge an understanding of all facets of the processes, from the atomic precision of designing atomic active sites, to large-scale reactor design. Many catalytic procedures default to a fixed-bed reactor, due to the range of control over fl...
Documents
Unlock document linkOpportunity notice on Contracts Finder
29 Oct 2019
Opportunity notice on Contracts Finder
Tender notice · Web page
Untitled document
Not provided
Tender notice
Awarded contract notice on Contracts Finder
23 Nov 2020
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.