Black Park Lake Outflow Bank Repair
To supply and install metal posts (6"x6" RSJ) piled into the stream bed along the agreed stretch of the BP lake outflow, on the east side, replacing the full length of timber on this side of the channel. Lengths of steel will vary, depending on height of wall/channel at point of piling, but at the end supporting most weight the steel will be 6ft in the ground. 100 x Oak sleepers (2.4m long, 200mm x 100mm) will be placed between all RSJs and laid level. Any soil needed to back-fill will be excavated in from unseeded...
Buyer
Buckinghamshire Council
Value
£8,100
Published
15 Jun 2020
Closes
11 May 2020
Procurement details
Source
Contracts Finder
Region
South East
Procurement method
Direct
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
44000000
Construction structures and materials; auxiliary products to construction (except electric apparatus)
Lots
Lot default Black Park Lake Outflow Bank Repair
£8,100
To supply and install metal posts (6"x6" RSJ) piled into the stream bed along the agreed stretch of the BP lake outflow, on the east side, replacing the full length of timber on this side of the channel. Lengths of steel will vary, depending on height of wall/channel at point of piling, but at the end supporting most weight the steel will be 6ft in the groun...
Delivery: South East · United Kingdom, South East, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
15 Jun 2020
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.