Cwmystwyth Planning and Design
The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) reduction in the amount of fine grained, metal rich sediment newly entering the main river system through erosion of exposed spoil and in channel deposits at Cwmy...
Buyer
MINING REMEDIATION AUTHORITY
Value
£421,540
Published
20 Jan 2026
Closes
22 Apr 2025
Procurement details
Source
Contracts Finder
Region
United Kingdom
Procurement method
Selective
Category
Services
Contract starts
15 Jan 2026
Contract ends
31 Dec 2027
CPV classifications
71356400
Technical planning services
Lots
Lot default Cwmystwyth Planning and Design
£421,540
The principle, long term objective of the Cwmystwyth project is the reduction of metal loadings entering the Afon Ystwyth from the Cwmystwyth site. The proposed works aim to significantly reduce (by up to 50% immediately downstream) concentrations / loadings of dissolved lead and zinc in the Ystwyth, as well as a significant (but currently unquantifiable) re...
Delivery: Wales · United Kingdom, Wales, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
20 Jan 2026
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.