618133 M4 J17 West Bridge Deck Resurfacing
Remove the full carriageway width between the kerbs from joint to joint and resurface during four night time closures of the west deck. 60m long HRA surfacing replacement, kerb to kerb, full depth. Where defective waterproofing is found this should be cut back to sound material. Best endeavours shall be to remove defective waterproofing, assumed as all exposed waterproofing. The method for removal shall be via scraping the deck, not by fine milling. Any remaining waterproofing shall have a clean edge, achieved thro...
Buyer
National Highways
Value
£54,358
Published
31 May 2024
Closes
2 May 2024
Procurement details
Source
Contracts Finder
Region
Birmingham
Procurement method
Selective
Category
Works
Contract starts
2 May 2024
Contract ends
13 Jun 2024
CPV classifications
45233210
Surface work for highways
Lots
Lot default 618133 M4 J17 West Bridge Deck Resurfacing
£54,358
Remove the full carriageway width between the kerbs from joint to joint and resurface during four night time closures of the west deck. 60m long HRA surfacing replacement, kerb to kerb, full depth. Where defective waterproofing is found this should be cut back to sound material. Best endeavours shall be to remove defective waterproofing, assumed as all expos...
Delivery: South West · United Kingdom, South West, United Kingdom
Documents
Unlock document linkAwarded contract notice on Contracts Finder
31 May 2024
Awarded contract notice on Contracts Finder
Award notice · Web page
Contains public sector information licensed under the Open Government Licence v3.0.