Battery Test Station
NPL requires a Battery Test Facility with at least 4 channels, each having voltammetry/impedance capability. The default maximum current per channel is 5A, with an optional higher current capability desirable on one channel. We require the ability to characterise performance and lifetime of batteries using such a test system. The test facility will be capable of accurately measuring charge and discharge curves, cycle capacity, state of charge and state of health (via impedance spectroscopy) not only for Li-ion batt...
Buyer
NPL Management Limited
Value
£50,000
Published
18 Nov 2016
Closes
25 Oct 2016
Procurement details
Source
Contracts Finder
Region
London
Procurement method
Open
Category
Goods
Contract starts
Not provided
Contract ends
Not provided
CPV classifications
38500000
Checking and testing apparatus
Lots
Lot default Battery Test Station
£50,000
NPL requires a Battery Test Facility with at least 4 channels, each having voltammetry/impedance capability. The default maximum current per channel is 5A, with an optional higher current capability desirable on one channel. We require the ability to characterise performance and lifetime of batteries using such a test system. The test facility will be capabl...
Delivery: London · United Kingdom, London, United Kingdom
Documents
Unlock document linkOpportunity notice on Contracts Finder
11 Oct 2016
Opportunity notice on Contracts Finder
Tender notice · Web page
Document access. Suppliers MUST register with Due north to access the Procurement documents. All communications must be routed through Due North. Suppliers comm...
Not provided
Document access. Suppliers MUST register with Due north to access the Procurement documents. All communications must be routed through Due North. Suppliers communicating outside of the Eprocurement portal may not be included.
Tender notice
Contains public sector information licensed under the Open Government Licence v3.0.