Awarded Contractocds-b5fd17-4b804c1d-cdd1-466e-b6eb-69433bf6c1d9

WP4693 Dungeness A Desiccant and Catalyst

The Dungeness A reactors shut down in December 2006. Since that time desiccant and catalyst have remained within 14 vessels but have not been in operation. The function of the desiccant material was to absorb moisture from the primary carbon dioxide cooling gas. As a result, the desiccant is likely to be heavily contaminated with tritium in the form of adsorbed tritiated water. The catalyst material will be similarly contaminated. The Phase 1 analysis will determine if there are significant quantities of active con...

Buyer

Nuclear Waste Services

Value

£82,987

Published

12 Apr 2023

Closes

19 Sept 2022

Procurement details

Source

Contracts Finder

Region

United Kingdom

Procurement method

Selective

Category

Services

Contract starts

11 Apr 2023

Contract ends

16 Feb 2024

CPV classifications

90520000

Radioactive-, toxic-, medical- and hazardous waste services

Lots

Lot default WP4693 Dungeness A Desiccant and Catalyst

£82,987

The Dungeness A reactors shut down in December 2006. Since that time desiccant and catalyst have remained within 14 vessels but have not been in operation. The function of the desiccant material was to absorb moisture from the primary carbon dioxide cooling gas. As a result, the desiccant is likely to be heavily contaminated with tritium in the form of adsor...

Delivery: North West · United Kingdom, North West, United Kingdom

Awarded contract notice on Contracts Finder

12 Apr 2023

Awarded contract notice on Contracts Finder

Award notice · Web page

Contains public sector information licensed under the Open Government Licence v3.0.